Want to know how large crystal chandelier cleaning? Cleaning a single crystal droplight needs what kind of tools? Today crystal chandelier factory made Yang lighting Li Gong detailed explain for everyone, listen up, oh.

we all know that a large crystal droplight in installation and disassemble need professional personnel to operate, then the cleaning maintenance is also have the technology content of a job, we need to prepare the following tools: functional water aspirator, ladders, high temperature steam spray gun, waterproof mat, high pressure spray bottle, microfiber cloth, scaffolding, all-around detergent, detergent decontamination to oil special cleaning agent, metal maintenance agent, etc.





large crystal chandelier cleaning and maintenance steps:

1, lay good waterproof mat or water content, using of the word ladder when looking for good with good position.

2, check whether the power switch is closed, to ensure that in the case of security operations.

3, remove steam spray gun, downward pressure steam safety cover, and open to reverse direction.

4, injection is less than 350 ml water, it is strictly prohibited to use containers filled with water, twist clockwise.

5, insert the power cord in the 220 v ac socket preheating 5 & ndash; 8 minutes, to determine when cleaning is convenient to use.

6, the particles under the capacity of the cover from the injector, according to clean the usage of crystal droplight add special cleaning agent into the capacity of the cover.

7, adding capacity in the detergent particles inside the injector, cover tight capacity cover. Into the cleaner before you will control valve closed. In diluted detergent do not exceed the maximum capacity of 5 l of enclosure.

8, the micro particle injector access 220 v power supply, in order to ensure the effect of atomizing factory has qualified motor speed range please do not open it without changes.

9, micro particle injection through to shoulder, one hand injection pipe at work, with the front just above the rear box.

10, according to the spray head at work a button to turn on the switch, and then gently turn the regulator knobs, according to the need of work adjustment droplets size, and rotation speed knobs, adjust the speed of spray distance.

11, before you close the spray valve flow down properly, requires no impurities to prevent pipeline.

after 12, adjusted the regulator flow, to jet crystal droplight overall 1 & ndash; 2 minutes, spilled the professional crystal droplight detergent evenly on each part.

13 will stop cleansing agents on the surface of crystal chandeliers, 3 & ndash; 5 minutes, make special cleaning agent can penetrate into bottom of stain the surface of the crystal droplight, oily be soiled, fall off, dissolution, emulsification.

14, each a power supply, please raise a spray head, let the cleaner in the detergent tube flow back to the housing case, dripped.

15, spraying work has been completed, the particles in the injector cleaner excess residual liquid, injection water, big flow, switch on for a minute, dry storage.

16, using high temperature steam spray gun, install stretch hose, insert the corresponding position, completely closed so far.

17, gently press the steam button, observe whether can release, steam and back spray vapor lock, can lock the steam button for steam supply ( In use process to keep the power on) 。

18, after use, pull out the high temperature steam spray gun plug, cut off the power and press the steam button, release the steam pressure, until no steam jet.

19, poured all the water in high temperature steam gun, dry, in the toolkit.

20, remove the low voltage micro fog cleaners, open the lid, into the water.

the 21st, the adjustable nozzle to micro fog.

22, the micro fog cleaner air pressure switch to the highest stress state.

23, low voltage micro fog to clean through to the shoulder, and the water lever lock for the micro fog state, for each part of the spray nozzle uniform crystal droplight.

24, spraying is completed, open the drain valve drain off the residual air pressure, and the remaining water discharge, close to the toolkit.

25, the blower access 220 v power supply, to hot air condition, the crystal droplight surface residual moisture drying.

26, remove the blower power supply, power cord, as tools in the box.

27, open source, with or without abnormal test lamps and lanterns, normally open, if appear abnormal open you will need to eliminate problems, until the normal light.

28, sort out the scene, cleaning, put away all the tools.



the above is the detailed content of cleaning and maintenance of large crystal droplight, steps and of course crystal chandelier crystal chandelier manufacturer factory made Yang lighting thought in the process of large crystal droplight maintenance need to use a lot of professional tools and professional operation process, if you have no such tools and worry about clean does not reach the designated position, can we give you arrange related after-sales service, professional cleaning team for you love the light for the maintenance.

crystal chandelier factory made Yang lighting 24-hour hotline: 18022062115 Li Gong
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...