The steps of landscape lighting construction design!

by:EME LIGHTING     2021-03-22
The state of life of 'doing at sunrise and resting at sunset' no longer exists. The advancement of technology has allowed us to see the charm of the city that never sleeps. The colorful lights make the city at night gorgeous and charming. Of course, all these are attributed to the landscape lighting. The construction design came into being. Landscape lighting construction design is also a knowledge that needs to be studied. Let us take a look at the 6 major steps of landscape lighting construction design.



   1) Collect information and understand the situation:



   mainly collect design specifications, standard atlases and other design basis materials, collect light source and lighting product samples and other equipment selection materials, and also understand the process production, use requirements, and construction and structure conditions.



   2) Lighting design:



   Illumination design is as follows: collect original data→determine lighting method and type→determine reasonable light source→choose the form of lamps and determine the model→arrange the lamps reasonably→calculate the illuminance and determine the installed power of the light source→appraise glare →Determine the lighting control strategy and so on.



  3) Electrical design:



  The steps of electrical design are as follows: determine the power distribution method→divide the power supply range of each switchboard and its installation location→calculate the working current of each branch line and main line, select the conductor cross section and model, laying method, pipe diameter, and carry out Check calculation of neutral line current and voltage loss→Choose electrical equipment.



  4) Final connection of pipe network:



   In the electrical lighting design process, the pipeline network should be summarized with other professional designs, and carefully check whether there are contradictions and conflicts between the pipelines. Under normal circumstances, avoid electrical wiring or take protective measures.



   In the installation and laying of electrical lighting, there are often pre-embedded threading pipes, brace welding parts or pre-embedded holes, etc., which should be submitted to the civil engineering at the time of summary. The information should be specific and precise, such as the position of the reserved hole, the distance from the coordinate axis, and so on.



  5) Drawing of construction drawings:



   The steps of drawing a construction drawing are as follows: draw a floor plan → draw a diagram of the power distribution system → write a project description → list the main material list.



  6) Preparation of budget estimates (budget):



   is determined according to the requirements of the construction unit or design power of attorney.
Custom message
Chat Online 编辑模式下无法使用