Home   |   PROJECTS   |   Four Points by Sheraton Gurgaon Faridabad Road, India

Four Points by Sheraton Gurgaon Faridabad Road, India


Profile

Description:  Standing high as one of the prime buildings on the Gurgaon – Faridabad road. Prism Executive-Suites, Hotels & Towers is one place of unbound opportunities and unprecedented ecstasy. The hotel property has done a management & Operation Contract with Four Points by Sheraton. The hotel will hopefully open in the end of 2018.
Rooms:  220
The decoration lighting for the ballroom and pre-function areas of Four Points by Sheraton Gurgaon Faridabad Road, India was completed by EME in 2017.

 

 

1F
VISITING EME SHOWROOM  

 

Clients visited EME Lighting showroom in 2017
Two samples were selected as the chandelier for hotel's pre-function and lobby areas.
Effect picture of Prism Executive-Suites, Hotels & Towers
There are three buildings in this business area —— one suite, one hotel and one office.

 

 

Custom Chandelier for project's lobby
The designer choose this design for the hotel's lobby area.
EME Showroom Sample
Showroom sample is similar, need to add crystal ball at the bottom. The custom size is: L10950*W7100*H600mm ( 2pcs ),  L18600*W7100*H600mm ( 1pc ).
EME Showroom Sample
This sample is selected by designer for hotel's pre-function area. The custom size is: D800*H600mm, 5pcs/set, total 6 sets.

 

2N
PRODUCTION EME FACTORY  

 

Drawing details:

Size:  L10950*W7100*H600mm ( 2pcs ), L18600*W7100*H600mm ( 1pc )

Material:  Stainless steel ceiling plate in chrome color with Chinese K9 crystal.

Position:  Lobby

 

Drawing details:

Size:  D800*H600mm ( 30pcs )

Material:  Stainless steel structure in chrome color with Chinese K9 crystal.

Position:  Pre-function

 

Chandelier production for lobby
making holes for led spot light at the ceiling plate
Chandelier production for lobby
making holes for led spot light at the ceiling plate
Chandelier production for pre-function
making rings for the chandelier's bottom and top

 

3R
INSTALLATION HOTEL SITE  

 

 

Front view of hotel site


           

Entrance of hotel site


           

 

 

Installation of pre-function chandelier
EME Lighting's technical engineer is working with local people.
Client is taking photo for checking
Client's local people will come site for effect checking everyday.
Installation of the hotel lobby chandelier
The ceiling plate need to be installed at first before crystal later step.

 

Un-packing of the lobby chandelier

EME Lighting's technical engineer went to hotel site for lighting installation instruction work for local people.

               

Installation of the lobby chandelier

EME Lighting's technical engineer went to hotel site for lighting installation instruction work.

Contact